Wolf Creek Dam
Additional Info
Award Winner : WillScot Mobile Mini
Architectural Excellence : When an over-crowded maze of single and double-wide trailers began to negatively affect project progress, Treviicos Soletanche JV selected a modular office building as the solution. The office building allowed the general contractor to consolidate resources and personnel. This made for a more efficient running of the $584 million dam rehabilitation project. A site was selected to minimize disturbance and expedite the delivery requirements while still meeting the needs of the contractors. The new 12 section modular facility, located on the east side of the Wolf Creek Dam, features 15 private offices, three sizable conference rooms, and two large cubicle areas.
Cost Energy Effectiveness : A minimum of R-15 insulation in the ceiling space, R-11 insulation in the walls, and R-22 insulation below the sub-floor was provided. The accelerated design and manufacturing, coupled with simultaneous site preparation, enabled the general contractor to seamlessly occupy the building while staying on schedule for their long-term rehabilitation project.
Occupied Date : 3/25/2009
Production Start Date : 2/2/2009
Project Location City : Jamestown
Project Location State Name : KY
Technical Innovation : Strategically placed dedicated outlets and data junction boxes allowed the general contractor to set up their state of the art printing and plotting equipment in the designated area as well as cutting edge media equipment in each conference room.
Total Square Feet : 8460
Category : Relocatable: Office: over 5,000 sq. ft.