UPS Office
Additional Info
Award Winner : Kent Homes, a division of J.D. Irving, Ltd.
Architectural Excellence : This building was able to meet the UPS brand standards and requirements for a building that would be visually recognized as the UPS office while being built in a modular facility. The building includes a large ADA compliant bathroom for the employee as well as a large storage and work room with exterior access and a roll down security screen. The customer entrance area includes a service counter and bank of mailboxes. The building was installed downtown directly across from the college and it integrated quickly into it's surroundings.
Cost Energy Effectiveness : Using modular construction allowed the owner to build through the winter months, a time that can be costly for construction. It also allowed them to reduce their construction time by building offsite while the siteworks were ongoing.
Engineering Firm Name : MCW Maricor
Installer Firm Name : Bastarache Prefab Homes
Occupied Date : 3/12/2018
Production Start Date : 10/13/2017
Project Location City : Bridgewater
Project Location State Name : Nova Scotia
Technical Innovation : Factory built construction allowed us to achieve this build during the winter months. We did not expose the buildings to weather and moisture and did not disrupt a busy downtown corner with long ongoing construction. We were able to be in and out of the site with the building with minimal disruption and built a nice looking office retail space.
Total Square Feet : 1664
Category : Permanent: Retail: under 10,000 sq. ft.