Two-Storey Rig Complex - LEP-1
Additional Info
Award Winner : Kan-Bud
Architectural Excellence : Our new two-storey relocatable facility for United Oilfield Services and Lane Energy is a technical mobile and self-sufficient rig camp meant to serve at shale gas and oil rigs. UOS is an oilfield service company that has recently expanded to Europe and currently holds great potential in fracking and drilling on the continent. Meeting the current demand for state-of-the-art modular buildings in the industry expanding in Poland, it is a self-existing multi-functional and complete area, built of recycled 40ft. converted first trip metal sea containers and wooden construction units. The total amount of 18 ea units is 6932 sq. ft. The facility with all media installations that serve a modern rig consists of fully-equipped air-conditioned accommodation units, a commercial laundry, drying and changing room, dining area for 18 persons, offices, sanitary and technical units.
Cost Energy Effectiveness : The facility is 100% factory completed; that includes all system testing and sign off. All fixtures are chosen for their low volume and low energy use abilities. The 2,4 inch sandwich panel is a great advantage as far as thermo-insulation parameters are concerned. Also, it allows for a larger usable space. Essentially, the low volume and low energy fixtures limit and control the client’s needs to reload on natural resources -- all units are white coated, serving as a heat shield for high temperatures. Each module is designed so as to be aerodynamic and is of standard transport dimensions in order to be transported both offshore and onshore with utmost ease. The quick site erection process is reduced to minimum, the usage of recycled containers and the rapid transport system contributes to cost effectiveness and an eco-friendly approach. What minimizes limited surface problems at rigsites is the fact that the units are stackable and are compatible with other units including skid types.
Design Firm Name : Kan-Bud
Occupied Date : 9/30/2013
Production Start Date : 7/30/2013
Project Location City : Lublewo
Technical Innovation : What constitutes for innovation is combining two kinds of structures: bigger wooden units on skids piled up on the converted sea containers, both with landings and staircases. Also, water and sewage installation service is an innovation element within this camp: two water and sewage service system tanks are set within one module. Assembly is on ground, thus it is not necessary to install tanks underground. The camp is equipped with specialized technical units: workshops, storage facilities equipped with chain operated cranes, which is quite a unique element as far as container storage space is concerned. The fly camp is structurally, mechanically and electrically prepared for easy and rapid connection and erection. The entire facility is structurally supported on steel frame, which serves a permanent foundation for the facility. The modules were designed on the basis of regular sea containers maintaining their exterior dimensions with international heavy truck transport functionality.
Total Square Feet : 6932
Category : Relocatable: Special Application: any square footage