Skip to content

Toronto Transit Commission

BlackD_100891337E.jpg BlackD_100891337V.jpg

Additional Info

Award Winner : Black Diamond Group

Architectural Excellence : The Toronto Transit Commission was faced with the challenge of constructing a subway station including terminals, tunnels, subways, retail, and wholesale services adjacent to York University as an addition to their extensive public transit network. They needed a custom on-site space to accommodate a multidisciplinary team of engineers, consultants, inspectors, and administration staff. BOXX Modular, along with manufacturing partner Enfab designed, built and installed an 8,640 square foot facility comprising of two modular office complexes. The finished facility is a multi-functional space, and comprised of administrative offices, executive offices, conference rooms, restrooms, and a kitchen area. The two modular complexes were custom-built; one 60x60 according to the Toronto Transit Commissions specifications and the other 60x84 according to the prime contractor’s (Ellis Don) specifications. BOXX Modular’s ability to meet expectations of both the project owner and subcontractor was a d

Cost Energy Effectiveness : Modular construction allowed the office complex to be completed in a fraction of the time it would have taken for conventional construction. Site preparation was completed by the prime contractor simultaneously with the manufacturing process. This concurrent construction process provided the Toronto Transit Commission with quick installations and minimal disturbances at site, making it a fast and streamlined solution for the construction project. Being a rental project, the Toronto Transit Commission did not have to concern themselves with having to dispose of or relocate the facility once the project is complete as the dismantle service is managed by BOXX Modular. Having the product under manufacturer and component warranty mitigated risk and potential maintenance costs on behalf of the client. BOXX Modular’s experience in delivering office complexes similar to this project allowed for expedited manufacturing and installation of a custom-built facility which resulted in significant c

Occupied Date : 10/2/2013

Production Start Date : 8/23/2013

Project Location City : Toronto

Project Location State Name : Ontario

Technical Innovation : BOXX Modular delivered a custom built 8,640 square foot modular facility comprising of two distinct office complexes within 40 days. The buildings were manufactured frameless with a steel exterior and a triple beam perimeter which allows for superior durability and higher quality installation. The strength and durability of the steel exterior and triple beam perimeter ensured that a potential relocation of the modules would easily maintain the integrity of the original structure. BOXX Modular remained flexible when the prime contractor requested a last minute design change amidst the manufacturing process to allow for more space. The change request was accommodated without delay in the project timeline. The building design was critical as the client required an exceptionally durable and safe product to suit the working environment. The modular complex was constructed using thermal windows utilized for higher energy efficiency, allowing for natural light and quality heat insulation.

Total Square Feet : 8640

Powered By GrowthZone