Skip to content

TAG Construction

Britco_116706E.jpg Britco_116706V.jpg

Additional Info

Award Winner : Metric Modular

Architectural Excellence : This two-story building was designed as the head office for a local construction company with management and accounting offices, conference room, reception, lunchroom and washrooms on the main floor and project administration staff on the second floor.

The client required a comfortable, effective working environment for employees with a level of finishes, millwork and furnishings that would impress their customers. The window configuration and front entry canopy were designed to add presence to the building and project a professional first impression.

Cost Energy Effectiveness : The foundation is a concrete strip footing and perimeter wall, insulated and heated to maintain a constant building temperature. Each floor has its own high-efficiency HVAC system and operates independent of each other. Energy-efficient features include numerous low-E windows to maximize natural light.

Occupied Date : 6/26/2009

Production Start Date : 3/24/2009

Project Location City : Langley

Project Location State Name : BC

Technical Innovation : Located in a high precipitation climate, the building was designed with the latest rainscreen technology to ensure dry, breathable walls and eliminate the prospect of mold and mildew. It is equipped with a sprinkler and monitored fire alarm system to meet local building codes.

The foundation was designed to accommodate a full-access concrete ramp while minimizing the entry height from grade level.

Total Square Feet : 3472

Powered By GrowthZone