Rio Tinto Holden Mine – Dan’s Camp
Additional Info
Award Winner : Aries Building Systems, LLC
Architectural Excellence : This re-remote housing unit is comprised of eight-housing components; which include a full service commercial kitchen and dining hall and a recreation area for the tenant’s enjoyment. It also includes; two, six unit, 44-man sleeper wings, each equipped with dormitory style wash rooms to accompany the dining facility. This structure utilizes a rigid steel skid and steel exterior. It includes all interior furnishings, and at the clients’ request, the structure was designed to survive the rigors of being treated as a piece of equipment. It is a simple design that can withstand the extreme environment changes, while fulfilling the needs of the customer efficiently.
Cost Energy Effectiveness : The Aries Building System re-remote housing unit has attained cost effectiveness due to a sound engineering, material and procurement process that allowed Aries to provide our product in a very short time frame, while maintaining cost effectiveness. Extensive safety guidelines and multiple teams involved in the logistics and site preparation, proper project management and flawless execution were necessary in order to be cost effective for the user. Proper management of the entire process allowed Aries to provide a fully turnkey facility prior to the proposed deadline of June 1st and under budget.
Installer Firm Name : Aries Building Systems, LLC
Occupied Date : 5/15/2016
Owner Firm Name : Aries Building Systems, LLC
Production Start Date : 4/1/2016
Project Location City : Holden Village
Project Location State Name : Washington
Technical Innovation : This structure has R-19 in the floor systems, R- 19 in the wall system and R- 49 in the roof system. In addition, this structure has low E windows, energy efficient heating and cooling system and low water consumption plumbing fixtures.
Total Square Feet : 9968
Category : Renovated Reuse: Greatest Renovation: any square footage