Quebrada Blanca Fase 2 - Concentradora
Additional Info
Award Winner : Tecno Fast S.A.
Architectural Excellence : Teck's Quebrada Blanca Phase 2 (QB2) project will be one of the largest copper operations in the world. It is located in the north of Chile, at more than 4,000 meters above sea level, so the site conditions are complex and it is far from urban centers. The camp meets the needs for beds to be able to build the expansion of the mine and extend its useful life.
The project includes a percentage of definitive beds destined for the operation and a percentage of transitory.
The entire camp is designed to accommodate 4,100 people, in single, double and triple rooms with private bathrooms. About 1,600 beds are leased (part of the WFH fleet) and the remaining 2,500 beds are permanent, destined for operation. In addition, it considers the construction of 2 dining rooms and kitchens (temporary and permanent), recreation areas, gym, training rooms, polyclinic, fire brigade and offices, among others. In total there are 44,670m2 equivalent to 1,184 modules, which were built in just over a year.
Cost Energy Effectiveness : Given that the project is located above 4,000 meters above sea level, the performance of the people is low and it is difficult to find workers who want to work in such areas. This translates into high cost and low efficiency labor. Finally, the complexity of the project meant that all solutions had to be designed with a high percentage of prefabrication. From the foundations, through the modules and ending with the complementary services and / or developments. This strategy undoubtedly makes costs efficient. Another relevant point is that the temporary buildings were structurally designed to be mounted on wooden piles, even the 2-story ones, which made for an economical quick assembly and in the future a less invasive dismantling and demobilization. The use of bedroom modules with incorporated corridors was given priority, so that when the lease of the buildings was finished, all materials weren’t lost when disassembling the project and could be 100% reused in other project.
Design Firm Name : TECNO FAST
Engineering Firm Name : Tecno Fast
Installer Firm Name : RS Montaje
Occupied Date : 5/10/2020
Owner Firm Name : Compañia minera Teck Quebrada Blanca S.A.
Production Start Date : 3/5/2019
Project Location City : I región de Tarapaca
Project Location State Name : Región de Tarapaca
Technical Innovation : Optimization of the design of modular buildings with BIM technology and robotic machinery. All buildings manufactured and installed by Tecno FAST are adapted to the environment, and comply with the thermal enclosure standards that govern the entire country. We use thermopanel windows and continuous insulation on floors, walls and roof. Moisture control membranes are also provided on the walls and ceilings. The covers are PVC membranes with a low level of UV absorption. With this we manage to regulate the temperatures in winter and summer. In many cases, we meet the requirements for LEED Silver and Gold certification.We use high level materials of built-in finishes that facilitates inline manufacturing, and saves subsequent maintenance work. The bathroom designs meet the water saving requirements, separate button for downloads, and in some cases, we use gray water networks to recycle the water. As for the lighting, it is completely provided with LED technology.
Total Square Feet : 44670
Category : Relocatable: Workforce Housing: over 10,000 sq. ft.