New Port Reuse
Additional Info
Award Winner : Tyson OnSite
Architectural Excellence : The unit were detailed with clear span beams, roof top HVAC units, Stucco exterior with a parapet wall with scuppers and downspouts as well as commercial doors and high end reflective blue windows to match existing. The building was crane set and installed by Tyson Onsite & Ron Frost onto a permanent crawl space at grade. Touch screen thermostats & motion lights for energy savings required by the client.
Cost Energy Effectiveness : Based on the reuse alone this was a very cost effective way for Tyson to support our growth with existing fleet.
Engineering Firm Name : Tyson Onsite
Installer Firm Name : Tyson Onsite
Occupied Date : 3/23/2014
Production Start Date : 2/8/2014
Project Location City : New Port Indiana
Project Location State Name : IN
Technical Innovation : In an effort to reduce waste going to the landfill, Tyson Onsite was able to recondition and reuse an aged complex of 46 floors. The building was idle from the government and Tyson was able to convert each of the individual boxes into fleet friendly units to make a variety of different sized buildings for different applications. We built from double wides up to 13 unit complexes. There were at least 7 different projects we were able to fulfill with this "new" product one of which is a feather in our cap. Kremer Pharmaceutical was in need of a permanent office that will be equal or better than their existing campus of buildings. The unit was detailed with clear span beams, roof top HVAC units, Stucco exterior with a parapet wall with scuppers and downspouts as well as commercial doors and high end reflective blue windows to match existing. The building was crane set and installed by Tyson Onsite & Ron Frost onto a permanent crawl space at grade. Touch screen thermostats & motion lights
Total Square Feet : 38000