Skip to content

NC State Temporary Dining Facility

Mobile_443939E.JPG Mobile_443939V.JPG

Additional Info

Award Winner : Mobilease Modular Space, Inc.

Architectural Excellence : North Carolina State Univ. is a world class institution known for its leadership in education and research. Located in Raleigh NC the univ. sits on a beautiful campus. In partnership with Chik-Fil-A, Univ. Campus dining services wished to construct a modular dining facility with fully functional Commercial kitchen to support the fast food franchise until a permanent cafeteria was constructed some time in 2014. The facility will help bridge the gap between current student needs and the opening of a permanent dining facility that is part of a larger project complex that will be constructed nearby in 2014. The modular is designed for A-3 occupancy and type 5-B construction fully sprinkled. The building design was based on Wake County Health requirements in conjunction with NC State Univ. standards for Safety and Security. Specific requirements of Chik-fil-a were also taken into account as part of the interior finish selections and equipment requirements.

Cost Energy Effectiveness : Mobilease was able to assist North Carolina State in the design of the modular building, allowing the university to save on the architectural fees that a design firm would charge for this work. All of the kitchen, mechanical and electrical equipment were designed per the latest North Carolina energy codes. Mobilease hired a third party inspection agency to do an air balance that ensures that the mechanical system operates at peak efficiency.

Occupied Date : 4/25/2011

Production Start Date : 2/3/2011

Project Location City : Raleigh

Project Location State Name : NC

Technical Innovation : Modular was built to meet current North Carolina Energy Code. Fire alarm system designed to meet state fire alarm requirements. Exhaust and ansul system for kitchen designed to meet Wake Co. health requirements as well as integration of fire alarm and fire suppression system with campus wide system. Freezers/coolers from PolarKing connected seamlessly to building with utility service and fire suppression loops designed for freezer installations connected to main building system elevated from grade to match finish floor of building separate grease waste and sanitary waste from kitchen. There are approximately 75 pieces of equipment requiring specific outlets/wiring configurations as well as locations. Hot water system designed with fast recovery per Wake County health requirements and NC Code.

Total Square Feet : 6700

Category : Relocatable: Retail or Hospitality: over 2,000 sq. ft.

Powered By GrowthZone