Skip to content

Modular Transition Building

IconCo_10170982E.jpg IconCo_10170982V.jpg

Additional Info

Award Winner : Icon Construction, Inc.

Architectural Excellence : One modular building's (16) floors make up a total of 11,520 sq. ft. of transition space for Fort Gordon. This facility was designed to care for the needs of our troops during the transition time while the orthopedic hospital space was being renovated. There is a fully functional x-ray room and casting room as well as exam rooms.

Cost Energy Effectiveness : Icon Construction’s modular buildings meet or exceed all current energy codes. Sustainability begins with Icon’s centrally located U.S. manufacturing plant. The 65,000 square foot state-of-the-art facility utilizes an abundance of natural lighting and other energy saving technologies. Materials utilized in Icon modular buildings include recycled steel, recycled carpet, recycled lumber, LED lighting and double-paned low-E windows as well as various other products. In addition, unused materials are recycled. Icon Construction’s modular manufacturing process allows us to provide a cost-effective modular building solution by managing time spent on construction and by controlling other factors like labor and material costs.

Design Firm Name : Icon Construction, Inc.

Occupied Date : 8/31/2011

Production Start Date : 6/8/2011

Project Location City : Fort Gordon

Project Location State Name : GA

Technical Innovation : The lead shielding for the x-ray room was designed in such a way that it was all installed during the manufacturing of the modular units.

Total Square Feet : 11520

Powered By GrowthZone