Skip to content

Mary Mount School

The documentation required was: 1. Technical specifications of the product 2. Engineering calculations 3. A specialist Sign for structural designs to support safety and material quality for the Earthquake Resistance Norm NSR-10. However, in the legal aspect this modular system does not require license for construction. TecnoF_6532847E.jpg TecnoF_6532847V.jpg

Additional Info

Award Winner : Tecno Fast S.A.

Architectural Excellence : The project consists in the execution of temporary kindergarten and elementary classrooms, offices, auditoriums, lab, art and music classrooms and restrooms during the construction of the new buildings, taking care of engonomy and safety for the students and administrative staff.
This project was placed over the soccer and basketball courtyards.
The modular construction was selected by the client because of the comfort, agility, safety and the reduced environmental impact.
The architectural design was developed so every block has access to its own interior
play yard and is surrounded by vegetation to interact with nature.

Cost Energy Effectiveness : The main aspects to reduce cost in this project were:
1. Fast installation process and kick off, offering a short time for the client to continue their activities.
2. Low demand of contractual personnel and equipment during the installation process, reducing cost.
3. Reusing main and finishing material.

Design Firm Name : Arq Consultoria

Engineering Firm Name : Arq Consultoria

Green Building Description : Unlike traditional construction, modular designs have a low environmental impact. Materials are used only for the project and its installation and are totally reused afterwards, guarantying a sustainable construction process all the way.

Installer Firm Name : Tecno Fast

Occupied Date : 1/8/2018

Owner Firm Name : Fundacion Nuevo Marymount

Production Start Date : 1/6/2018

Project Location City : Lima

Project Location State Name : Lima

Technical Innovation : This modular project attended the school requirement and demand very fast and in a versatile way, due to the short period of time they had to relocate their students ad staff. The project was positioned with agility, minimizing environmental impact and reducing it to zero.
In addition, this type of construction does not require complicated paperwork that may delay the operation.

Total Square Feet : 1545

Powered By GrowthZone