Award Winner : Sommer's Mobile Leasing
Architectural Excellence : The hospital was short on space and needed a temporary facility for training. There was only one place to locate the unit and it was sloped. We also had to incorporate an ADA Ramp. All of this needed to fit in with the look of the Hopsital. We poured concrete sidewalk to marry up with the ramp for easy access.
Cost Energy Effectiveness : None.
Occupied Date : 8/12/2011
Production Start Date : 6/26/2011
Project Location City : Mt Vernon
Project Location State Name : OH
Technical Innovation : The ADA Ramp and concrete poured to achieve compliance.
Total Square Feet : 1344