Skip to content

Grand Erie School Addition

Provin_10161455E.jpg Provin_10161455V.jpg

Additional Info

Occupied Date : 9/1/2008

Production Start Date : 6/1/2008

Project Location City : Brantford

Project Location State Name : ON

Total Square Feet : 3776

Award Winner : Provincial Partitions, Ltd.

Technical Innovation : • Climate controlled independent of main school facility (Change Air units)
• Pier foundations on for mobile structure
• Ramp corridor connecting modular unit to existing building
• Secure card reader access
• Combination of welded steel and roll formed steel members
• Invisible seam/mate lines throughout.
• Exterior fiber cement board

Cost Energy Effectiveness : • Roll formed light steel
• Low maintenance exterior fiber cement board
• Energy efficient and clean air Change air units
• Low maintenance interior vinyl covered mold resistant wall panels
• Mold resistant vinyl roof panels
• One piece floor sheet goods
• Modules all transported to site easily by truck
• Shipped, offloaded and placed in three days

Architectural Excellence : • Transportable 10 piece building (59’ X 64’)
• Non-combustible construction throughout
• Light gauge roll-formed steel framing for walls and roof
• Easy maintenance interior walls are vinyl covered mold resistant gypsum
• Floor is one piece welded, seamless sheet goods.
• 18” roof overhang over windows
• Torch applied modified bitumen cap sheet and cap flashings
• Ramp corridor for easy handicap access.
• Foam insulation
• Aesthetically pleasing, designed to blend in with surroundings.

Powered By GrowthZone