Skip to content

GE Nuclear - 13 Unit

Willia_725251E.jpg Willia_725251V.jpg

Additional Info

Award Winner : WillScot Mobile Mini

Architectural Excellence : This 13-unit Redi-Plex complex was ideal for the build-out of Redi-Walls for offices, conference rooms, break room and restroom facilities. The exterior is a durable wood siding with a rubber roof. The modular building entrances are ADA compliant, having aluminum decks, ramps and stairs. The interior is a warm and welcoming mix of vinyl covered gypsum walls, matching vinyl covered Redi-Walls, commercial acoustical ceiling, VCT flooring in restrooms, with carpeting throughout the office area of the building.

Cost Energy Effectiveness : This building was equipped with energy and water conservation in mind. All electrical fixtures are energy efficient. All plumbing fixtures are water conservation-type fixtures. Even the structure was designed to conserve time and cost for installation.

Calendar Days to Complete: 107 (30 Factory Production, 42 Customer’s Permit Delays, 35 Onsite including Customer’s changes)

Occupied Date : 9/1/2006

Production Start Date : 6/1/2006

Project Location City : Wilmington

Project Location State Name : NC

Technical Innovation : The customer’s schedule for completion of the building was made possible by the innovative use of our Redi-Plex Product. The shell was comprised of (13) new modular units, (12) without any interior partitions. The new existing units were factory stock units completed in June 2006.

Total Square Feet : 9360

Powered By GrowthZone