Fort Bragg Motor Pool Administration Building

Comark_889716E.jpg Comark_889716V.jpg

Additional Info

Award Winner : Comark Building Systems, Inc.

Architectural Excellence : The 3,572 square foot, triple wide modular Fort Bragg Motor Pool Administrative Building was built and installed in the historical district of Ft. Bragg and was mandated to meet specific fort historical requirements. The exterior façade of wainscot and stucco was selected in order to visually blend with the already existing architecture of the veteran fort. Approval from the historical society for the cosmetic exterior appearance and landscape plan was received. Consistent canopies, shingles, stucco color and some interior selections were required to blend in with local older buildings. Serving both as administrative offices and central headquarters for motor pool dispatching operation, the building consists of seven carpeted offices, two sets of handicapped men and women’s restrooms, a conference room, a breakroom, a storage room, easy access corridors, a dispatch center and a waiting room.

Cost Energy Effectiveness : The pre-hinged roof provided cost efficiency and time savings, not to mention an ingenious solution to simplifying erecting the roof on site. As a temporary building, reuse and relocatability was a factor considered in the building design. Standard size modules for building construction production allowed the customer to occupy the building in less time than standard office construction. Energy efficiency was achieved using R-30 roof insulation, R-19 wall insulation, R-19 floor insulation and low-E glass windows. Fire-rated sheetrock and fire sprinklers mounted into the drop ceilings were included. Wrapped sheetrock provided durability and efficiency. The short factory production time, quick set-up and finishing once on site, lowered the initial set-up costs.

Occupied Date : 9/30/2009

Production Start Date : 6/1/2009

Project Location City : Fort Bragg

Project Location State Name : NC

Technical Innovation : A hinged roof design was created for this project to create economies in transport and set up time. The modules for the building were delivered on three separate transports with a hinged roof section pre-built in the factory on modules one and three. Completing this detail in the factory environment saved time and money for the client and resulted in an easy and efficient install. Once the building was crane-set, the hinged roofs were folded over and the center truss section was installed.

Total Square Feet : 3572

Category : Relocatable: Office: under 5,000 sq. ft.