Skip to content

Federal Way School District

Modern_4451460E.jpg Modern_4451460V.jpg

Additional Info

Award Winner : Modern Building Systems, Inc.

Architectural Excellence : When Federal Way School District began the ambitious goal of a high school campus renovation, they knew they would need temporary space. Bringing forty-four classrooms, a library building and six dedicated restroom buildings to campus created flexible space that classes could be rotated through as the demolition and rebuild of the entire school was completed in stages. These buildings were placed on a variety of terrain, including the former football field and student parking lots. Classrooms specific to a specialized need, such as the home economics classroom, sit adjacent to bright, open classrooms ready for whatever subject needs a temporary home during this stage of construction. Keeping the students on the main campus and within easy access of other classes and resources was vital to the district.

Cost Energy Effectiveness : Reusing the prime real estate of the high school campus and renovating its existing facility allows the district to invest funds that may have otherwise been tied up in land acquisition, into the quality of the new facilities. Having the educators and the 1450 students stay on the site during the drastic rebuild, while a logistic hurdle, proved a savings over creation of temporary schools off site, as well as saving the mental cost of a divided high school. The collaborative environment of the general contractor on site with the educators and students opened doors to creative innovations in the new facility.

Engineering Firm Name : Modern Building Systems, Inc.

Green Building Description : Modern’s zero waste manufacturing plant process and green purchasing practices create inherently environmentally-responsible buildings. Reuse of these temporary buildings by future users will insure that the materials harvested to create them are given the respect and lifetime that they warrant.

Installer Firm Name : Modern Building Systems, Inc.

Occupied Date : 2/11/2015

Owner Firm Name : Federal Way School District

Production Start Date : 10/27/2014

Project Location City : Federal Way

Project Location State Name : WA

Technical Innovation : The essential need for expanded space for the district and its students meant that both the concurrent modular building leases and the renovation of the stick-built school building needed to begin as soon as possible. Within 70 days, manufacture of the temporary use buildings was complete and scheduled for delivery. Delivery schedule required collaboration with the general contractor performing the remodel as well as with the school’s relocation resources. Delivery and installation was completed in six weeks, including ramping and other access solutions.

Total Square Feet : 44808

Powered By GrowthZone