Skip to content

Drilling Control Center Office Space

Alta-F_47823E.JPG Alta-F_47823V.JPG

Additional Info

Award Winner : Alta-Fab Structures Ltd.

Architectural Excellence : The Drilling Control Centre serves as an on-site work space that must withstand rigorous operational use by groups in extreme field conditions over a long time period. Warm colours and a functional layout create a comfortable and inviting environment with high-end finishing. Two separate entrances each serve a unique group with large mud trays, “bomb proof” boot racks, and hooks for coveralls. State-of-the-art stainless steel geology sample sinks and custom ventilation hoods capture harmful fumes. Finished round-edge hard wood-finished nosings are on all desks and countertops, and custom-designed European-style millwork, completed in-house, add a touch of comfort and professionalism. The door, flooring, wall, and cabinet colour options show quality is customizable. For enhanced durability, a recessed mat with a top rubber layer and aluminum moulding was installed in the entry mud room. Electrical panels are finished with matching cabinet boxes that offer easy access to unit systems.

Cost Energy Effectiveness : The energy cost of operating this centre is reduced through high-efficiency triple glazed windows, 2x6 walls that prevent unnecessary heat loss, and the a high-efficiency output furnaces. All of these features keep heating bills low. A white rubber roof on the exterior of the building improves overall heat retention and increases light reflection experienced during the warmer seasons. As a result, expenses related to air conditioning usage are significantly reduced. Isolation water valves ensure only one fixture is inoperable at a time. Expensive shutdowns will not be an issue as operational activity will remain unaffected. 2x12 flooring sandwiched by 3/5 plywood on one side and 5/8 plus 3/4 T&G plywood on the other ensure that this unit will survive over 10 years active service in the field, even with biweekly location changes. This “structural services” makes it a very cost effective unit over 10 years. It also closely managed material waste to ensure cost-effective manufacturing.

Occupied Date : 11/26/2009

Production Start Date : 11/6/2009

Project Location City : Nisku

Project Location State Name : AB

Technical Innovation : The centre’s technical functionality was not compromised for comfort, high-end quality, or user-friendliness. This building is equipped with geology sample sinks, custom ventilation hoods to capture and evacuate harmful fumes, and all the technical apparatuses required by workers on-site. With durability a priority, the centre includes a 100% copper-fitted mechanical room and plumbing that features shut-off valves and hidden water lines. A sturdy, three-strand skid, featuring a wide flange, was installed, keeping the centre dry and safe from harsh weather and rugged elements. The layout was designed to create a sense of spaciousness within tight quarters. Specifications for sufficient storage facilities, desk space, and electrical capacity were factored into the design so that every inch of space was maximized for practical and operational use.

Total Square Feet : 720

Category : Relocatable: Single-Wide: any square footage

Powered By GrowthZone