Skip to content

Claremont Hotel & Spa – Administrative and Locker Room Bldgs.

AriesB_582879E.JPG AriesB_582879-ClaremontInstall.jpg AriesB_582879V.JPG

Additional Info

Award Winner : Aries Building Systems, LLC

Architectural Excellence : The Claremont Club & Spa at the historic Claremont Hotel in Berkeley, CA, considered a landmark and one of America’s iconic luxury hotels requested existing locker/shower rooms for its new tennis complex. Aries Building Systems, LLC was contracted to design, fabricate and install two newly manufactured 48’x40’ modular male and female locker/shower rooms, along with one 24’x52’ administrative support office. As the intended location for the modular facilities was on an elevated tennis court at the front of the hotel, the buildings were required to be aesthetically complimentary to the hotel motif, and suitable to the hotel’s demanding five-star clientele standards. The entire modular construction was completed offsite with renewable interior finishes such as ceramic floor tile, carpet, lighting, restroom facilities and showers, and electrical and plumbing fittings, allowing for minimal onsite final finish work, so as to minimize site construction timelines and exposure.

Cost Energy Effectiveness : The entire modular project was completed in 54 days, from contract to beneficial occupancy, affording the end client the versatility and utility of a thoroughly modern modular facility for its patrons to utilize during renovations to existing facilities. Minimal site construction timing was required, which afforded the client full utilization of onsite tennis facilities, essentially until the building sections arrived to be craned. Upon completion of planned renovations, the modular buildings will be dismantled, craned off, and removed from the site. In return, the Claremont Hotel & Spa is afforded the usage of state of the art modular buildings during construction, without the expense of erecting a more permanent stick-built solution for a clearly temporary need.

Design Firm Name : Aries Building Systems LLC

Engineering Firm Name : R & S Tavares Associates

Installer Firm Name : Aries Building Systems LLC

Occupied Date : 10/11/2017

Owner Firm Name : Claremont Spa and Residences

Production Start Date : 8/18/2017

Project Location City : Berkeley

Project Location State Name : CA

Technical Innovation : The modular buildings were manufactured to California’s Title 24 efficiency standards, with scaled electrical and plumbing capacity to support high volume and sustained utilization while on site. This innovative modular design of the buildings increased the flexibility of the buildings, reduced the dreaded infrastructure time and overall environmental impact. Because of the concerns to any potential damage to the historic site, the individual building sections had to be craned over 180 ft in 2 lifts on to the tennis court, then blocked and leveled upon a concrete block/wood foundation system, so as to minimize damage to the existing tennis court.

Total Square Feet : 5088

Category : Relocatable: Special Appplication: under 10,000 sq. ft.

Powered By GrowthZone