City of Williston Building & Engineering Department Temporary Office

AriesB_581231E.jpg AriesB_581231V.jpg

Additional Info

Award Winner : Aries Building Systems, LLC

Architectural Excellence : With rapid oil and gas development taking place in North Dakota, there has been a surge of building demands in the City of Williston. A 2,160 sq. ft. temporary office building was supplied to quickly and comfortably accommodate employees of the City of Williston’s Building and Engineering Department until a permanent facility can be built. The building was designed for the client to provide private offices, public reception areas, storage areas, meeting rooms, two ADA compliant restrooms and a coffee bar for staff and visitors.

Cost Energy Effectiveness : Modular construction allowed the City of Williston to affordably address the immediate needs for its expanding staff with minimal interruptions to its daily operations. The project was completed in under one month, providing much needed office and storage space. The buildings were designed with relocation and reusability in mind, should the buildings need to be used by other city departments.

Design Firm Name : ries Building Systems, LLC

Occupied Date : 6/17/2013

Production Start Date : 4/29/2013

Project Location City : Williston

Project Location State Name : ND

Technical Innovation : The factory-built modules were installed on a temporary block and pad wood foundation to minimize on-site disruption. The windows feature low-E coatings to suppress heat flow, and the HVAC units are equipped with heat pumps. Another characteristic was that the building can be easily expanded with additional modules to create extra office space.

Total Square Feet : 2115