Central Canadian Midstream Field Office

Northg_4943192E.jpg Northg_4943192-August 27, 2021 #1.jpg Northg_4943192-Sept 1 2021 Install #4.jpg Northg_4943192-Sept 1 2021 Install #4.jpg Northg_4943192V.jpg

Additional Info

Award Winner : Northgate Industries Ltd.

Architectural Excellence : The concept behind this high-quality Northgate Industries Ltd. modular office building was to give it a new design and sophisticated look vs. a traditional modular office complex. It has a pitched roof with vaulted ceilings, a circular central common area with a kitchenette, partition walls with glass inserts, a boardroom with a folding glass Nano wall, offices, and washrooms! On the exterior, we used a hardy board siding to give it that modern look and to provide better-insulating R-value and large triple-pane windows to let in natural light and for site visibility.
On the exterior we used a Hardie board siding while giving it a modern look also adds durability in extreme weather conditions against harsh winds, snow, rain, and hail. On the inside, we used mud, tape, and paint finish to give it a warm and quality look. We used a drop-down ceiling where the offices are and, in the middle, a vaulted ceiling to give it a spacious bright common area.

Cost Energy Effectiveness : Since Northgate uses an assembly line of factory workers, we can build quicker than onsite construction. Our crews are highly experienced and trained to complete their tasks efficiently and with less error. This allows us to complete more square meters quicker and saves time and money. This project added unique complexities due to being built during Covid.

Design Firm Name : n/a

Engineering Firm Name : Steenhof Building Services Group

Green Building Description : We reduced the amount of transport to the site with only four 15’x60’ modular units to construct this 3600 ft2 office complex. This caused less site disturbance and less pollution with fewer trucks driving to this remote site.
While we build these modules in our factory any leftover cut-offs are used for other projects within the build or saved for when they’re needed for other tasks. This creates very little waste throughout our build process.
Operational costs will be reduced due to advanced building envelope design including additional layers of insulation and triple-pane windows.
By the integration of using a tin roof, we eliminated the need for a replacement roof for the potential life of the complex.

Installer Firm Name : G N S Industrial Trailer Service Ltd

Occupied Date : 11/1/2021

Owner Firm Name : Central Canadian Midstream Company

Production Start Date : 7/1/2021

Project Location City : Cromer

Project Location State Name : Manitoba

Technical Innovation : In our controlled environment we minimized the amount of waste on this project by computer cutting lumber. We saved time and were able to put walls and roofs on quicker than traditional cutting. We use cranes with an experienced crew that carefully places each piece. By doing this we saved time and manpower and were able to move to the next station quicker where the next team is waiting to take over.
What's unique about this build is that we added a Nano glass folding wall in the boardroom. This offers a modern design, and it makes the room look larger. We also added a central common area that's completely round with 4 entrances to a full kitchen and sitting area for workers.

Total Square Feet : 3600