California State University San Marcos - Veterans Center

Silver_107902966E.jpg Silver_107902966-DSCN0302.JPG Silver_107902966V.jpg

Additional Info

Award Winner : Silver Creek Industries

Architectural Excellence : The project consists of a permanent modular structure on the CSUSM campus which houses the Veterans Support Center. The building houses a lobby, meeting space, four private offices, and support spaces. The building exterior utilizes a mixture of smooth fiber cement siding, metal panels, and horizonal wood siding and accents. A stepped roof design creates a visual connection with the adjacent structure while screening the mechanical equipment and providing the supporting structure for a future solar panel system. Large glazed openings are used to provide natural lighting and to take advantage of the views onto the college campus. The unique project site required an installation which extended the building approximately 40’ over the hillside. An exterior glazed operable wall system allows the building to open onto the raised deck patio for large events.

Cost Energy Effectiveness : The difficult project site and tight construction schedule made this project a perfect candidate for modular construction. The ability to perform the work in a factory environment provided the opportunity for significant construction cost reductions while simultaneously reducing the development impact, and duration, on the project site. The building systems were carefully designed to maximize the factory construction scope. The stepped roof extension utilized a factory built supplemental roof structure that allowed the modular structure to meet the shipping height limitations while also significantly reducing the associated labor in the field.

Design Firm Name : CSU San Marcos - Planning, Design and Construction

Green Building Description : High recycled content building materials were selected where possible and low-VOC materials were used throughout. The abundant glazing allows for an automatic daylighting system to significantly reduce the electrical lighting use during normal business hours. High performance glazing and cool roof systems allowed the mechanical system sizes to be reduced while maintaining comfort.

Occupied Date : 5/24/2019

Owner Firm Name : California State University San Marcos

Production Start Date : 4/1/2019

Project Location City : San Marcos

Project Location State Name : California

Technical Innovation : The project requirements and site constraints required a custom designed volumetric building solution. A pair of 12’x53’ modules were designed to accommodate the client’s functional requirements while also resolving the structural considerations required for a hillside installation. A single brace was used to support the structure and allow a projection of approximately 40’ beyond the hillside. A prefabricated supplemental structure was designed and fabricated to create the stepped roof element. High recycled content building materials were selected where possible and low-VOC materials were used throughout. The abundant glazing allows for an automatic daylighting system to significantly reduce the electrical lighting use during normal business hours. High performance glazing and cool roof systems allowed the mechanical system sizes to be reduced while maintaining comfort. The roof structure was designed to accommodate future solar panel system.

Total Square Feet : 1158

Category : Permanent: Office: under 10,000 sq. ft.